Sheilder Eco

Our main objective in Shielder Eco Waste Management Sdn. Bhd. is to provide a consultation in wastewater bio treatment system. We ensure your wastewater plant to be cost-effective, top quality of performance and efficient.

HERE WHAT WE SERVE FOR YOU

 

Sheilder Eco provide wastewater treatment plant assessment services to existing plant. We will help our client to operate the wastewater treatment in the most cost effective and to ensure that the treated discharge meets the Department of Environment's Standards.

 

We provide the engineering consultation, design and drawing services that follows our client's needs and expectation. We also give advices on how to facilitate and enhance your wastewater treatment plant so that it can perform at optimum efficiency and performance.

 

We also construct and supervise the construction of your treatment plant to ensure that all plant is built at its finest quality and adhere to all safety standards.

 

We provide operation and maintenance (O&M) on wastewater for our clients in both industrial and public sectors. We ensure that the operations and maintenances of the plant are kept at the optimum level of efficiency and performance.

 

Making a Survey of Factory Waste water  #Melaka#环士净系 帮助工厂解决高蛋白污水

Ready to help your factory manage your HIGH PROTEIN POLLUTION WASTE WATER

Please call 012 330 9298 

SaveOurCountry 真爱我们的土地
#环士净系 帮助工厂解决高蛋白污水
Ready to help your factory manage your HIGH PROTEIN POLLUTION WASTE WATER
Please call 012 330 9298
😎环境局达标! 🤑可银行贷款!
#factoryWaterTreatmentBUILD
⚗Waste Water BioTreatment #FILINGPATENT 📣REGISTER
>50ton #STANDARD #A
环士净系: 012 330 9298
Waste water Treatment Plan Series

----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------->

<----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

Project Slaughter House At Ipoh perak malaysia(build with material: cast iron)
Project slaughter house at negeri sembilan malaysia (build with material)
project backery factory at johor bahru malaysia (build with material: retaining wall)

 

project slaughter house at kuala lumpur malaysia (build with material: fibre tank)

Treatment result

Before
After

 

 

Retention Time 36 HOURS only !!!!

Standard "A"